The client intends to build a support heating plant (total capacity 45 MW). The client supplies citizens, companies and municipal institutions in Unterföhring with district heating from four deep geothermal wells. The support heating plant based on natural gas is to serve as redundancy and for peak loads. This is where the VE 433 emission measurements are awarded.
Delivery, installation and commissioning of measuring, analysis and evaluation systems for continuous flue gas measurement for three oil and gas boilers, each with a nominal output of approx. 15 MW, in accordance with the specifications of the BImSchV, including coordination with an approved monitoring body. The approval of the systems according to EN 14181 or DIN EN 15267 is a basic requirement.