Construction work for cooling towers | Tenderlake

Construction work for cooling towers

Contract Value:
GBP 150K - 150K
Notice Type:
Contract Notice
Published Date:
02 August 2016
Closing Date:
31 August 2016
Location(s):
UKI LONDON (UK UNITED KINGDOM)
Description:

LondonWaste Ltd owns and operates the EcoPark Energy Centre located in Edmonton, London. The Energy Centre is an Energy-from-Waste facility comprising 5 boilers burning approximately 500 000 tonnes of municipal residual waste per year, in a continuous 24-hour operation, 7 days per week.

Exhaust steam from the Energy Centre's 4 turbines is condensed by cooling water passing through the condenser's tubes before returning to the Five Cell Head Wrightson cooling towers and subsequent recirculation. This contract is for the refurbishment of Cells 1 and 2 of the Cooling Towers.



LondonWaste Ltd owns and operates the EcoPark Energy Centre located in Edmonton, London. The Energy Centre is an Energy-from-Waste facility comprising 5 boilers burning approximately 500 000 tonnes of municipal residual waste per year, in a continuous 24-hour operation, 7 days per week.

Exhaust steam from the Energy Centre's 4 turbines is condensed by cooling water passing through the condenser's tubes before returning to the Five Cell Head Wrightson cooling towers and subsequent recirculation. This contract is for the refurbishment of Cells 1 and 2 of the Cooling Towers.

Download full details as .pdf
The Buyer:
LondonWaste Limited
CPV Code(s):
45251150 - Construction work for cooling towers