The work of this consultation consists of the construction of a 4
Special pile-type foundations. Structural work in reinforced concrete. Carrier wall in cut stone.
Flexible floor coveringsFlexible linoleum-type floor coverings. Sports flooring. Leveling.
Painting - cleaningInterior painting work. Cleaning of works reception.
Heating - ventilation - plumbingHeating production by heat pump on geothermal energy supplemented by gas boiler. Distribution by underfloor heating and radiators. Ventilation by double flow air handling unit with recovery. Production of thermodynamic DHW for the gymnasium and decentralized electric heaters for other needs. Independent system type VRV for academic inspection offices.
Electricity - strong currents - weak currentsPower supply from the existing TGBT at the Fournier stadium. Creation of division boards, wiring, lighting, equipment, metering. VDI, SSI pre-cabling, access control, sound system, time distribution, anti-intrusion alarm, videophone.
Lifting deviceLift 630 kg.
Photovoltaic generatorPhotovoltaic generator for self-consumption and resale of the surplus with a power of 70.4 kWp.
Sports equipmentsHandball goals. Motorized basketball backboards. Volleyball & badminton posts. Storage racks.
Catering equipment and isothermal partitionsCatering and food refrigeration equipment. Isothermal partitions and specific joinery.
Earthworks - roads - various networks - exterior installationsPreparatory demolition work, earthworks, wet networks, dry networks, roads.
Green spaces - outdoor furniture - gamesGreen spaces - green roof - watering - damping floor coverings and wooden terrace - development of play areas - outdoor furniture.
Frame and timber frame wallsCoverings and cladding in powder coated steel. Cladding in aluminum composite panels. Laser cut steel cladding.
GeothermalGeothermal probes and networks.
Metal roofs - claddingCoverings and cladding in powder coated steel. Cladding in aluminum composite panels. Laser cut steel cladding.
sealingTwo-layer elastomer waterproofing with water retention. Waterproofing PVC membrane on a wooden support.
Exterior joinery - blackoutAluminum exterior joinery. Sun shades with fixed blades and adjustable stackable blades.
Metalwork - locksmithGrids, doors, guardrails, handrails, fencing, gates and metal gates.
Partitions - linings - false ceilingsPartitions and linings on framework. False ceilings removable and non-removable. False wooden ceilings.
Interior joinery - furnitureInterior doors & frames. Movable walls. Interior furniture.
Hard floor coverings - wall coveringsTiles, plinths and earthenware. Waterproofing under tiles and screed for underfloor heating.