Los 004 Landschaftsbauarbeiten, Gewässerbau
- Construction site preparation (flood measures and accident plan), protective measures, SiGe coordination, construction board, construction site equipment (24 mt), staking and surveying work, dewatering (sediment trap with catch dam 6 pcs.), traffic safety for 4 access roads, construction fence (approx. 1,900 m) - Construction road made of geotextile and gravel base course (1,120 m²) - Extensive mowing (10,700 m²) - Clearing of starlings up to 1.50 m (300 m²) - Clearing gauge (50 pcs.) - Clearing rootstocks > 0.1 - 0.3 m (256 m) Pcs.) - Clearing rootstocks > 0.3 - 0.5 m (68 pcs.) - Waste/garbage clearance, loose (35,000 m²) - Railway sleepers pick up concrete (65 pcs.) - Removing concrete foundations/fixtures (68 m³) - Dismantling chain-link fence (245 m) - Surface unsealing in-situ concrete (720 m²) - Asphalt pavement (140 m³) - Pick up natural stone paving (370 m²) - Structural installation to demolish railway bridge (950 m³) - Loosen soil and rock (approx. 18,000 m³) - Dismantle various bank and bed fortifications (total round 4,000 m²) - Demolition of various seawalls (total approx. 300 m³) - Demolition of drainage pipes (100 m) - Removal of topsoil (2,300 m³) - Wet dredging work Loosening soil (1,420 m³) - Deliver and install cohesive soil/clay (800 m³) - Reinstall soil from retaining area (approx. 9,000 m³) - Dispose/recycle soil and rock (approx. 33 tons) - Dispose of dredged material (approx. 2,300 tonnes) - Dispose/recycle construction waste (approx. 2,100 tonnes) - Dispose of mixed municipal waste (around 65 tonnes) - Recycling steel (approx. 370 tons) - Dismantling of disused pipelines (145 m gas, 355 m electricity) - Supply and manufacture various base safety systems (total area of around 1,950 m²) - Supply and manufacture various slope stabilizations (total area of around 9,700 m²) - Supply and manufacture vegetation rollers (380 m) - Supply and install slope protection mats (1,950 m²) - Manufacture live and dead fascines (total approx. 1,225 m) - Making willow timber (700 m²) - Roughing channel made of set stones Pipe outlet (150 m) - Supplying and installing hydraulic building blocks (135 m²) - Lifting and installing a gravel bank (880 m²) - Delivering, felling and planting trees and shrubs without bales (3,820 units) - Delivering and spreading various saturated solids mixtures (total 65 kg - 12,200 m²) - Deliver and erect bite protection fence (780 m) - Completion maintenance and 2-year development maintenance