Fixed fixtures joinery. Construction site equipment, workshop drawings, 6 classroom-long built-in wardrobes, 5 glazed interior partitions, some with sideboards, 1x interior fit-out tea kitchen, output kitchen, output counter, workroom/library, teachers' room, secretariat, school management.
In general. The building is in flood area. The drywall work is carried out partly in stock (approx. 2,000 m³) partly in the new building approx. (5,700 m³). The roof of the semi-basement two-storey structure is designed as a board stacking ceiling, which does not have a basement, partly
two-storey new building is partly designed as a wooden ceiling partly as a flat ceiling. The outer walls are concreted and the inner walls made of HLZ brick-built. The foundation of the new building is largely carried out as a base plate in various thicknesses.
Fixed fixtures joinery. Construction site equipment, workshop drawings, 6 classroom-long built-in wardrobes, 5 glazed interior partitions, some with sideboards, 1x interior fit-out tea kitchen, output kitchen, output counter, workroom/library, teachers' room, secretariat, school management.