Construct new bridge over the outlet at Pasvikelva (Pasvik river) in Bøkfjorden. The bridge is in total 284 metres long with lattice steel arch main span of 120 metres and viaducts in prestressing steel armature concrete as approach spans. The bridge has a total of 8 axes of which axes 1, 2 and 8 are founded directly on rock and 3 to 7 on pillars on rock.