Solar installation | Tenderlake

Solar installation

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 December 2019
Closing Date:
15 January 2020
Location(s):
PL21 Małopolskie (PL Poland/POLSKA)
Description:
Design, delivery and execution of installation works related to the supply and assembly of installations for generating energy from renewable energy sources - sets of solar panels, solar collectors, ...

The subject of the contract is the delivery, design and execution of installation works related to the supply and assembly of 2,413 renewable energy installations with a total installed capacity of 11.34 MW, including: 852 solar collector installations, 990 solar installations, 384 heat pump installations and 187 boiler installations for biomass on / in residential buildings belonging to natural persons (private buildings) under the project "Renewable energy sources for residents of member municipalities of the energy cluster" Biała - Ropa "co-financed from the European Regional Development Fund under Sub-measure 4.1.1 of the regional operational program of the voivodship of Lesser Poland for the years 2014–2020.

The scope of the contract includes:

- task No. 1: delivery and design as well as execution of installation works related to the delivery and assembly: 852 solar collector installations, including the number of buildings broken down into individual types of installations:

• type A - 316 pieces with a power of 3.50 kW,

• type B - 371 pieces with a power of 5.25 kW,

• type C - 165 pieces with a power of 7.00 kW,

- task No. 2: delivery and design as well as execution of installation works related to the delivery and assembly: 990 installations of photovoltaic panels, including the number of buildings broken down into installations with the capacity of:

• min. 2.04 kWp: 603 pieces,

• min. 3.06 kWp: 177 pieces,

• min. 4.08 kWp: 89 pieces,

• min. 5,10 kWp: 121 pieces,

- task of No. 3: delivery, design and execution of installation works related to the delivery and assembly of: 384 heat pump installations with a heating power of min. 1.67 kW,

- task of No. 4: delivery, design and execution of installation works related to the supply and assembly: 187 installations of biomass boilers with a capacity of min. 20 kW.

Installations for generating energy from renewable energy sources will be installed on buildings belonging to natural persons (private buildings) in the area of 10 communes participating in the project, i.e. Moszczenica, Biecz, Bobowa, Gorlice, Lipinki, Łużna, Ropa, Sękowa, the city of Gorlice, Uście Gorlickie from the Lesser Poland voivodeship. Deliveries with assembly will take place simultaneously in all 10 municipalities.

Download full details as .pdf
The Buyer:
Gmina Moszczenica – Lider odpowiedzialny za przeprowadzenie wspólnie prowadzonego postępowania przetargowego
CPV Code(s):
09331100 - Solar collectors for heat production
09332000 - Solar installation