The purpose is to define the necessary works for the renovation of the branch to Cox-Callosa de Segura and the Redován branch from the main pipeline of Torrevieja. The action aims to renovate the network, replacing the existing fibre cement sections with new ductile iron pipes sized for the planned design flows.
The purpose is to define the necessary works for the renovation of the branch to Cox-Callosa de Segura and the Redován branch from the main pipeline of Torrevieja. The action aims to renovate the network, replacing the existing fibre cement sections with new ductile iron pipes sized for the planned design flows.