Lot 23 - Electrical Engineering
Part of the old building:
- approx. 10 pcs sub-distributor
- Approx. 4.5 km installation cable for high-voltage current
- approx. 500 m cable duct
- approx. 130 pcs luminaires
- Approx. 600 m high-voltage PA cable
- 1 piece earthing system with dissipations of the lightning protection system
- approx. 8 pcs watches
- approx. 120 loudspeakers according to DIN VDE 0833-4
- approx. 1 microphone for the fire brigade
- approx. 30 EMA motion detectors
- approx. 70 data ports (without active technology)
- approx. 9 intercom stations of the intercom system
- approx. 1800 m dismantling of final circuits
- approx. 80 pcs dismantling luminaires
- approx. 1 piece construction power system (construction site power connection cabinet, construction site power distribution cabinet, floor sub-distributor, construction site power distribution cabinet, lighting)
New building section
- 1 piece GHV-AV
- approx. 7 pcs sub-distributor
- Approx. 16 km installation cable for high-voltage current
- ca. 500 m Kabeltrassen
- 1 pcs sun protection control
- approx. 650 luminaires
- Approx. 1600 m PA cable high-voltage current
- 1 piece lightning protection system
- 3 pcs Disability Emergency Call Low Current
- approx. 20 pcs watches
- 1 piece electro-acoustic system (ELA/SAA) according to DIN VDE 0833-4
- approx. 100 loudspeakers according to DIN VDE 0833-4
- 1 piece burglar alarm system (EMA) of security class A
- approx. 20 EMA motion detectors
- approx. 2 pcs SHEV
- Approx. 230 data ports (without active technology)
- approx. 5 intercom stations of the intercom system