Installation of an elevator system for 3 stops.
New construction of an office building in the logistics school of the Bundeswehr, 3 stories. The tendered output includes a lift system with over and under ride, dimension of the cabin 2.1 x 1.2 m for illicit transport, with powder-coated portals and doors, cabin with stainless steel lining. Connected load approx. 7.5 kW.