B 28, new building between Rottenburg and Tübingen, construction phase 2, road construction node Rottenburg Ost and upgrading Neckar bridge.
Road construction:
- Ground movements approx. 78,000.0 m
- Milling work approx. 6,000.0 m
- Frost protection layers approx. 7 000.0 m
- Combined frost protection / base layers approx. 1,500.0 m
- Gravel base courses approx. 23,000.0 m
- Bituminous base layers approx. 14,000.0 m
- Bituminous binder layers approx. 14,000.0 m
- Bituminous cover layers approx. 14,000.0 m
Bridge construction:
- Static system: 3-field continuous beam,
- Superstructure cross-sectional shape: 2-wall slab,
- span: 18 - 29-18 m,
- total length of the bridge: 65.0 m,
- construction height: 1.0-1.5 m,
- width between the railings: 15.25 m,
- excavation pit excavation approx. 200.0 m
- Concrete work approx. 180.0 m
- reinforcing steel approx. 200.0 t,
- prestressing steel approx.2.0 t,
- steel railings approx. 160.0 m,
- Bridge sealing approx.1,200.0 m