Metalworking | Tenderlake

Metalworking

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
11 January 2023
Closing Date:
03 February 2023
Location(s):
DE40B Oberspreewald-Lausitz (DE Germany/DEUTSCHLAND)
Description:
locksmith

Renovation and conversion of the existing workshop, gross floor area 1,560 m², new construction of a workshop building, gross floor area 1,061 m²

1. Old building

1.1 Preparatory work

- 1 psch static calculations based on approval statics

- 1 psch workshop drawings for steel components

1.2 Indoor

- Galerie Malsaal: 35m² covering sheet, 25m edge upwell, 88m substructure made of hollow profiles 120/60mm, 25m railing made of post spar knee bar, ladder with back protection H 4.000mm

- Steel staircase storage prop: 1 piece steel cheek staircase, barrel with platform, 3 pcs 16/30, L 2.11 m W 1.3 m, grating covering, railing 2.2m, handrail 2.5m

- Steel staircase boiler room: 1 piece steel cheek staircase, barrel with platform, 2 Stg 17.5/28, L 1.32 m W 1.20 m, grating covering, railing 2.6m

- Handrail staircase: 13m wooden handrail round oak, 20 pcs brackets incl. milling in the handrail, 8 pcs transitions, 8 pcs 90° bends

1.3. Outdoor area

- Exterior staircase Malsaal: hot-dip galvanized steel construction, barrel with platform, L 4.5 m B 1.5 m, steel bolster staircase 9 Stg 17.2/28, grating covering, railing 10m, handrail stainless steel 7m, duplex coating DB 703 iron mica

- Lichtgraben fencing: 54m belt railing + knee rod, gate, shaft ladder H1.6m

- 1 psch adaptation light shaft canopy to new elevator shaft, approx. 7m

- 1 psch fall protection staircase window made of 2 steel rods each L 1.89m

- 1 pcs grating entrance platform 1.89 x 1.6m

- 1 St Fenstersicherung Vergitterung RC2 1,1 x 1,5m

- 4.4m handrail on existing loading ramp incl. mounting sleeves

2. Extension

1.1 Preparatory work

- 1 pcs stat. Calculations and workshop drawing canopy entrance

- 1 psch static calculations based on approval statics

- 1 psch workshop drawings for steel components

2.2 Indoor

- Handrail staircase: 29m wooden handrail square 40/80mm oak, underside groove + flat steel for connection to consoles, 40 pcs brackets, 16 pcs transitions, 9 pcs 90° bends

- Railing staircase: 15m railing on concrete staircase run 1 to 4 and stair platform OG, upper belt and vertical bars 50x8mm on stair bolster edge plate, bar distance 10.5cm, 3 pcs 90° corners

- 1 shaft cover pump sump, checker plate accessible, 900x900 mm

2.3. Outdoor area

- Loading ramp southeast: hot-dip galvanized steel construction L x W x H = 8.6 x 3.2 x 1.4 m, consisting of 10 lattice girders HEB140 L 3.3m with welds to edge beams, 2 edge beams U180 L 8.6m, 8 columns HEB140 L 1m with head and foot plates, 28m² tear plate with underside support ribs for bracing, 24 pcs 1-fold and 2-fold mounting sleeves for holding railings, 19m bracket handrail with knee bar and handrail, stairs made of 2 steel bolsters U160 L2.6m and 7 pcs grating steps, duplex coating DB 703

- 2 t substructure ventilation system on staircase roof, BLH 4,1x2x0,65m

- 3 pcs connection points on roof for cable tensioning exhaust air chimney

-1 pcs canopy entrance WxL 9,2x1m, overhead glazing VSG, suspension