Contract Value:
-
Notice Type:
Contract Notice
Published Date:
18 June 2019
Closing Date:
23 July 2019
Location(s):
DK050 Nordjylland (DK Denmark/DANMARK)
Description:
Pre-Qualification Phase Electrical Package Windfarm Nørrekær Enge 2

Vattenfall intends to award a contract to a qualifying company for the Electrical package including the engineering, design, construction, installation and commissioning works for its onshore wind project Limfjord- Nørrekær Enge 2 located on Jylland, Denmark.

Contractual scope includes, but not limited to:

(a) supply of the 33 kV cables and the fiber optic cables;

(b) installation, trenching, termination and testing of the 33 kV cables and Fiber Optic cable from the wind turbine tower to the substation;

(c) design and engineer, supply, installation, commissioning and testing of the 33/60 kV transformer;

(d) design, engineer, supply and construct the substation building and all its auxiliary services;

(e) design, engineer, supply, installation, commissioning and testing of the substation’s equipment, LV equipment and SCADA;

(f) supply of spare parts and required special tools for the Substation’s equipment and for the 33 kV cable and its accessories.

Download full details as .pdf
The Buyer:
Vattenfall Vindkraft A/S
CPV Code(s):
45232221 - Transformer substation
45310000 - Electrical installation work
45317000 - Other electrical installation work
45317200 - Electrical installation work of transformers
45317300 - Electrical installation work of electrical distribution apparatus