22E0258 (LBB NL Koblenz) Bw-Zentralkrankenhaus Koblenz-Metternich, new building 1.BA operating and functional building, refrigeration
Installation of an air-cooled chiller in split design
- 4 pcs liquid cooler 1.000W
- 4 pcs condenser with 1,200W
- 4 pieces distributor/collector combination 140m³/h
- approx. 5,200 kg base frame condenser
- approx. 4,000 kg support construction
- approx. 6,000 kg refrigerant R515B
- 2 gas alarm panels
- 4 pieces circulation pump 160 m³/h
- 1 piece compressor printer position, base vessel 1500l
- 2 units degassing system
- 3 pieces of dirt and sludge separator DN 200
- approx. 94 fittings DN15 to DN 300
- approx. 500 m refrigerant pipe, DN 100 to DN 150
- approx. 570 m steel tube seamless black, climate cold water, DN 15 to DN 300
- ca. 400m Kabelrinne, Steigleiter, Elektroinstallationsrohre
- approx. 2.300m cabling
- Commissioning and adjustment