Lot 32: outdoor facilities.
1. Field work / soil disposal
- Soil removal approx. 620 m
- Excavation of pipe and sewer trenches (depth up to 4 m) approx. 650 m
- disposal of soil approx. 2 360 t,
- Shoring with piling wall approx. 5 m,
2. Fortified manufacture
- Production of paths with concrete paving approx. 440 m
- Production of gravel lawn approx. 20 m
- Production of paving on a sub-structure (roof garden) approx. 38 m
- Manufacturing road with concrete pavement approx. 600 m
- Restoration of the road with natural stone pavement approx. 300 m
- Restoration of parking spaces with concrete paving approx. 180 m
3. Enclosures - bar mesh fence with gates approx. 110 running meters
4. Sewage systems
- Production of drainage channels approx. 40 m,
- Flat roof gutter in the roof garden approx. 20 m,
5. Technical facilities
- Foundations for chillers and air towers approx. 15 m
- Concrete slab for tank farm approx. 55 m
- media channel approx. 70 m,
6. External installations
- Plant bed as a raised bed with steel frame and bench approx. 60 m
- Bicycle leaning bracket 19 St ,,
- bicycle shed 1 pc,
7. Vegetation areas
- Creation of lawns and meadows approx. 1,360 m
- Production of perennial areas approx. 500 m
- Production of perennial area on the roof garden approx. 50 m
- Production of wooded areas 18 pieces,
- New tree plantings 8 pcs.