Roofing and façade work
The A.V.E. Own operation Paderborn district plans construction
a central district building yard, consisting of the following
Building parts:
· double-locked operation and administration building - G1
· Laundry room - G2
· Workshop building - G2
· Vehicle hall - G3
· Salt Hall - G4
· Carport building - G5
· bulk boxes
In addition, the following facilities should include
future usage needs are available:
· brine container
· Car repair shop
· indoor crane
· Lifting platform
· central washroom
· in-house gas station
· own heating system
Implementation is to be done at the disposal center “Alte Schanze”
in Paderborn.
The existing waste disposal centre extends over
an area of just under 150 hectares, including development and
open spaces.
By building at this central
The location creates meaningful synergy effects between district building yard and disposal center, as all
Infrastructure facilities already exist.
(See procurement documents for exact scopes)
Roofing and façade work
Services:
1.Construction site equipment, statics
2.Safety precautions
3.trapezoidal sheet - roofing
4.Facade cladding
4.01Facade substructure
4.02Facade
The services are subject to
Processing specifications and installation instructions of the
manufacturers for the building materials and elements used
and products, the publications of the
Department of generally recognized associations and the
other publisher of guidelines, leaflets,
recommendations etc. at the time of execution
valid version as agreed.
In the event of contradictions, the more extensive or
higher quality requirement than agreed.
All required for a component or component
components are from the system of a
material manufacturer and as a continuous
to offer product lines.
All components of similar type and location must be
matched surfaces, shades, fold geometries,
edge formations, fittings, etc., to create a
to ensure design consistency.
The AN only uses building supervising
approved (ABZ) or building inspected (ABP)
building materials and elements or those with
CE declaration of conformity from the manufacturer. Are such
building materials or elements not in exceptional cases
, the AN is available for proof of
lawfulness of execution responsible. So far
consent for this in individual cases (ZiE)
is required, the AN is concerned about this. In this case
is it up to the AN to coordinate the Zie on schedule
and all costs and fees incurred for tests, calculations, expert reports, examinations/trials and
to bear permits.
hoists, debris, material containers,
Waste containers are according to every entrepreneur
need to be made and not separately
remunerates.
Bid bases
Further basics of the offer are: are the additional
technical regulations. At the time of
Submission of the offer valid version: Imported structural engineering
regulations, valid DIN standards, building authority
notices and approvals as well as other technical standards and
technical regulations; technical rules and guidelines of
Crafts, manufacturer's instructions for the material and its
processing. Professional association, construction, local and
traffic regulations as well as laws and guidelines
environmental and nature conservation.