plastering work and thermal insulation systems.
In the course of the third construction phase, the wall surfaces of the northeast façade are insulated with mineral wool, plastered and painted. Connections to the panel cladding (aluminum) of the window belt façade are manufactured using a joint chamber connection and require precise coordination with the façade construction company and construction management.
Wall area to be processed approx. 200 sqm.
Joint chamber connection to apparel approx. 134 m