A 143, AS Halle-Neustadt (o)- AD Halle-N (A 14) (m), A143, BL3.4.3 Altbergbausanierg. Verpressen Absch. 1
In the course of the new four-lane construction of the A143 motorway, the route between construction km 9+500 and km 11+150 crosses a former lignite and clay mining area, in which the route will be stabilised against possible rock damage.
Scope of work BL3.4.3 is drilling with backfilling and injection between construction km 9+580 and 10+320
1150 m of core drilling
6460 m flush boreholes with partial core
550 m Teilkernbohrungen
68000 m Spülbohrungen
25900 m of drill holes of the contractor's choice
33800 t of cement for backfilling and grouting work