Delivery, installation and commissioning of 2 identical 50 MVA power transformers
In the Elbestraße substation, a total of two identical 50 MVA power transformers (110/10 kV) are to be replaced in 2024 and 2025. The transformers are replaced one after the other at intervals of approx. 4 - 6 months. The sites are free-standing within the substation.