Relocation of Bundesstraße 3 southeast of Celle, here 3rd construction phase
-6,200 m³ topsoil removal and loading, transport up to 3 km, rent
- Remove and cover 2,700 m³ topsoil
- 29,000 m³ of soil removal, loading, transporting up to 3 km, as dredging, renting
- closed. Water retention construction pit, 600 m³ volume
- Excavation pit, sheet piling, length up to 10 m, 650 m² shoring
- Deliver and install 1 corrugated steel passage > 5.0 m, length 21.50 m
- 20 m Füllstabgeländer , h = 130 cm
- 70 m of rural road construction, water-bound, Grandweg
- 1 Technical processing of excavation pit shoring, sheet piling wall
- 1 Technical processing of corrugated steel passage