Standard and easy to carry out construction of surroundings around and near the entrance of a general
hospital. Most of the surface is greened with artificial dunes/hills. Before
The rest there is a way to drop people off at the entrance and there is possibility for the
regular bus to make its way to a stop.
The whole can be technically equipped with a drainage system, lighting system that is controlled
is used from the building management system and the various barriers to settle parking
as well as making unwanted traffic impossible.
In addition, the sewerage installed from the previous phase must be finished with well edges and lids with the aim of working them neatly into the new levels of the environment.
When registering, the contractor takes into account that the operational reliability of the hospital and rest home must be guaranteed at all times and that he must be flexible in function of this.
The specifications refer via the article numbers to the measurement statement that is the detailed measurement state or
as a summary measurement statement can be consulted.
The works shall be carried out in accordance with the instructions on the approved and numbered
plans and details.
No provision in any part of the file can be interpreted as meaning that the agreement
would not be a general contractor with the contractor.
All printing or reproduction rights to the documents drawn up by the architect are reserved.
All graphical data (plans, cross-sections, details, etc.) and the technical and financial data
of the project are confidential.