The services provided by the contractor include technical equipment planning, anl.size 4 +5 in accordance with part 4 section 2 HOAI, service phases 2 to 9 in accordance with § 55 HOAI for the implementation of modernization and conversion measures of the boarding school (building 1-6) of the State School for the Blind and Visually Impaired in Neuwied. The buildings are located in the entire facility of the blind school in 56567 Neuwied, Feldkircher Straße.
Complemented by special services:
— to set up and update and finish the technical part of the room book,
— making all-pole schematics
— transfer of planning and cost data into digital collection forms in accordance with Section K 6 RLbau,
— completion of the technical part of the room book (inventory book),
- Monitoring the rectification of defects within the limitation periods.
The overall construction project consists of 6, essentially comparable boarding school buildings. Due to the spatial conditions, the 6 buildings are divided into 2 groups of measures.
— Group 1: Building 1-4,
— group 2: building 5-6.
The structural implementation of the overall measure takes place by building. Each building has its own construction phase.
The buildings are 2 floors, basement and flat roof. The development takes place via an upstream staircase with pent roof construction. External dimensions of each building: 23.10 m x 27.75 m.
The buildings must be renovated in accordance with fire protection concept and pollutant remediation is also required. The sanitary rooms will be rebuilt and rebuilt. Renovation and modernization work as well as the upgrading of the technical systems are also carried out.
Buildings 1-4 inhabit blind and visually impaired children. There are accommodation rooms (16 beds/floor), living-dining room, kitchenette and sanitary facilities, as well as conference, therapy room and office on the upper floor. The KG has storage, technical, hobby, play, fitness and toilet rooms.
Buildings 5 and 6 are currently used to care for adult people with multiple disabilities. Group, rest, therapy, multi-purpose, staff, sanitary rooms and tea kitchens are set up. The KG has storage, technology, hobby, party room, laundry room and work rooms.
Key measures:
Structural fire protection:
— training of a necessary hallway with walls in F 30-B quality,
— in the necessary hallways: expansion or training in F 30-A quality of fixtures, fire protection technologies. upgrading of manhole coverings,
— renewing the suspended ceilings in fire retardant quality.
Renovation, modernization:
— renovation of the sanitary area.
Technical equipment:
— adapting the scope of monitoring of the existing fire alarm system,
— inspection of the fire alarm and alarm system, emergency lighting and safety power supply by specialist planners and the resulting work,
— Renewal of electrical installation including GHV and floor distributors. New lighting.
The overall measure is divided into Measure 1 and Measure 2.
— measure 1 = 4 construction stages (building 1-4),
— Measure 2 = 2 stages of construction (buildings 5 and 6).
BGF/BRI/Usable areas/Total area:
— GFA: 6 x 1,920 m
— BRI: 6 x 5,512 m
— NF: 6x 1,533 m
Compilation of the estimated construction costs according to DIN 276
— KG 440 + 450: approx. 560 000 EUR.
Scheduling:
— measure 1 (born 1-4),
— construction document: 11/2021-01/2022,
— Approval planning: 03/2022-04/2022
— Implement planning: 03/2022-06/2022.
Awarding of trades:
— r. 1 and 2:07/2022-02/2023,
— born 3 and 4:07/2024-01/2025,
— Construction: 02/2023-12/2026 (building, successive).
Action 2 (born 5-6):
— construction document: 02/2026-03/2026
— Approval Planning: 04/2026,
— AFU Construction: 05/2026-07/2026
— award trades: 08/2026-01/2027,
— Construction: 02/2026-12/2028,
— r. 5:02/2027-12/2027,
— Born 6:02/2028-12/2028.