The HCA is proposing to undertake the construction of highways and infrastructure works at our Northstowe site, 10 km North West of Cambridge. See section II.2.4 for further details. Additional CPV codes include 45111000: Demolition, site preparation and clearance work and 65000000: Public utilities. The estimated total value is between 10 000 000 GBP and 15 000 000 GBP.
The scope of works includes, but is not limited to the following:
—Demolition/ remediation: including disused sewage treatment works, and treatment of localised/discrete contaminated ground;
—Southern Access Road West (SARW): 2.1km single carriageway access road, including associated drainage, structures, and side roads;
—Off-site link road: 1.5km single carriageway off-site link road;
—Phase 2 on-site road: 0.65km on-site road, including associated drainage and utilities;
—Phase 2 school access road: 0.6km school access road from existing Phase 1 development;
—Strategic drainage attenuation ponds: including bulk earthworks (approx. 200 000 m³);
—Utilities: laying of gas, water, foul, electricity and telecommunications.
—School plot: provision of fully serviced, level school plot for development by others.