Instruments for measuring flow, level and pressure of liquids and gases | Tenderlake

Instruments for measuring flow, level and pressure of liquids and gases

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
18 August 2021
Closing Date:
14 September 2021
Location(s):
DE212 München, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
DE278 Günzburg (DE Germany/DEUTSCHLAND)
Description:
Measuring distance

The gas high-pressure lines SV50 and UA06 from bayernets are located in the Günzburg-Kötz area. These high-pressure gas lines run from: Senden to Vohburg, (SV50) and Ulm to Augsburg, (UA06). The new GDRM system is to be planned with two double rails each (100% redundancy) for the two mentioned gas high-pressure lines. The telecontrol node existing at the site and the control of the existing v50 vage system (KH2874) must be integrated into the new GDRM station. Two new connection lines connect the GDRM system with the transport lines. The system will be integrated into a new building to be built. It is a GDRM system within the scope of the DVGW regulations G491 and G492 or equivalent.

The gas high-pressure lines SV50 and UA06 from bayernets are located in the Günzburg-Kötz area. These high-pressure gas lines run from Senden to Vohburg, (SV50) and from Ulm to Augsburg, (UA06). A NATO product line, DN250, runs parallel to the UA06 at a distance of about 8m. A few meters north of the property, the SV50 is crossed by UA06 and NATO's product management. The project is divided into two sections.

An overfeed from the SV50 to the UA06 has to be implemented by the end of 2022. The connection of the GDRM station to WK51 and the overfeed will be dismantling by the end of 2024. The new GDRM system is equipped with two double rails each (100% redundancy) for the two mentioned gas

to plan high-pressure pipes. The telecontrol node existing at the site and the control of the existing v50 vage system (KH2874) must be integrated into the new GDRM station. Two new connection lines connect the GDRM system with the transport lines. With the construction of the WK51 (Wertingen-Kötz), the connection to the collector is produced on the entrance side as part of the pipeline project. With the connection to the new line, gas transport will be included in the SV50 and UA06. The GDRM system is integrated into newly built building. As part of the project, services for site installation and construction clearance must also be provided. It is a GDRM system within the scope of the DVGW regulations G491, G492 and G463 or equivalent.

Download full details as .pdf
The Buyer:
bayernets GmbH
CPV Code(s):
38420000 - Instruments for measuring flow, level and pressure of liquids and gases
38421000 - Flow-measuring equipment