As part of the renovation of the End of the World stadium in Magglingen, the outside area around the running tracks will also be renovated. The plastic covering surfaces of raceways 1-6 and the east and west segments as well as the edging are completely renewed. The foundation layers of lanes 2-5 are reinforced. In front of the sports hall, the embankment is planted with flower meadows and individual trees. A septic basin is created at the foot of the embankment. The existing pole vault facility will be moved to a new location. The career is supplemented by a further 7th career including adjustment of the locations of the measuring points along the career. A moat (steeple) is newly created on the inside of track 1. In front of the weight room, seat step elements and a new plastic covering create space for new outdoor devices. The areas east and west will be connected with new paved paths.
As part of the renovation of the End of the World stadium in Magglingen, the outside area around the running tracks will also be renovated. The plastic covering surfaces of raceways 1-6 and the east and west segments as well as the edging are completely renewed. The foundation layers of lanes 2-5 are reinforced. In front of the sports hall, the embankment is planted with flower meadows and individual trees. A septic basin is created at the foot of the embankment. The existing pole vault facility will be moved to a new location. The career is supplemented by a further 7th career including adjustment of the locations of the measuring points along the career. A moat (steeple) is newly created on the inside of track 1. In front of the weight room, seat step elements and a new plastic covering create space for new outdoor units. The areas east and west will be connected with new paved paths.