Renovation of radiology and radiotherapy, S3 Component B,C,D/ Lot 143.2 Refrigeration systems
In the Braunschweig Municipal Hospital, large-scale medical equipment is being replaced in various measures during ongoing operation.
Part of the overall construction project is the construction phase of a refrigeration system (3rd to 5th construction phase). It includes a chiller installed in the building. Recooling takes place via two redundant recoolers on the building façade. The cold water network includes a distributor and a 1500 l buffer tank. Circulating air coolers and HVAC systems as well as technical devices such as MRI are supplied.
Scope of services - KG 434 Refrigeration systems:
- 1 pc chiller approx. 90 kW
- 2 St. Rückkühler
- 1 St. Kaltwasserverteiler
- approx. 300 m round ventilation pipe
- 1500 l buffer tank
- 6 St. Umluftkühler