A Framework in 2 Lots
Lot 1- FRA remedial works/passive fire protection (PFP)
Lot 2- Fire safety works (eg the Installation of Alarms. Sprinklers and water mist systems, AOV’s, Dry and Wet risers, Emergency lighting and other associated works.)
This is Lot 1
1) Remedial works (Passive Fire Protection)
Works could include (but not exclusively)
• Fire doors and furniture
• Fire resisting air transfer grilles
• Fire resisting glazing
• Linear gap seals
• Penetration seals for cables, pipes and other services.
• Cavity Barriers
• Ceiling Systems
• Compartment seals
- compartmentation
- enclosures
and other associated works
as set out in the Specification
Lot 2- Fire safety installations, which could include, but not exclusively:
Fire Alarms
Sprinklers and water mist systems
AOVs (automatic over-ride vents)
Emergency lighting
Dry risers and wet risers
Other associated/related works
in accordance with and set out in the Specification