Refurbishment of the Regional School North
The regional school north in Neubrandenburg is a complex consisting of three buildings of the type POS SR 80 Dresden. The individual buildings each represent self-contained structures that are neither structurally nor structurally dependent on each other. The building parts were erected in reinforced concrete slab construction with ceiling-bearing outer and inner longitudinal walls in the construction "WBS 70 G, GH 3300" (former GDR construction).
Size of the building parts L x W x H:
Building A: 20.4 x 18.0 x 13.2 - 4 floors; Building B: 32.4 x 18.0 x 13.2 - 4 floors; Building C: 16.8 x 12.0 x 9.9 - 3 floors - connectors For more see II.2.4.
GA systems Regional School North
Regulation for heating and ventilation systems:
Heater:
- regulation of the district heating station 170 kW,
- Control of distribution systems with 6 heating circuits.
Ventilation:
- Regulation 6 supply and exhaust air systems,
- Control about 5 exhaust fans.
Interior plaster
Innenputzarbeiten:
- Lime-cement plaster 115 m 2nd ,
- Lime-gypsum plaster 475 m 2 .
- Plaster door panels 835 m.
Tile and plate work
- floor tiles
—— Prepare the surface 325 m 2nd ; Floor tiles, stoneware, thin bed 325 m 2nd ; Pedestal tiles 210 m - wall tiles,
—— Prepare the surface 440 m 2nd ; Wall tiles, stoneware, thin bed 440 m 2nd - stairwell - inventory,
—— Check and clean terrazzo tiles 205 m 2nd - stairwell - new building,
—— Prepare the surface 74 m 2nd ; Cast stone covering, terrazzo 74 m 2nd ; Steps with anti-slip protection 100 m; Risers 100 m; Base 65 m.
Flooring work
- Preparatory work
—— Clean the underbody 3 720 m 2nd ; Primer, primer 3,720 m 2nd ; Full-area filling 3 720 m 2nd ; Cut off screed edge strips 2 340 m - covering,
—— rubber flooring 3,720 m 2nd ; Rubber flooring has 3 720 m 2nd - Equipment,
—— Base training 2 340 m.
sun protection
- Install 60 St. Venetian blinds with motor / cable supply (attachment on existing wall within a new curtain wall).
Curtain wall
- Curtain wall with special substructure, insulation and fire barrier 1 775 m 2nd ,
- aluminum frames as window frames 691 m,
- 373 m window sills to match frames,
- Calculate facade statics.
Photovoltaic
- 9.6 kWp generation plant for own consumption,
- 70 O Regulation,
- 32 pieces of monocrystalline PV modules,
- 1 pc. Inverters up to max. 10 kVA,
- with substructure on a steel structure,
- 30 O Riot,
- 1 generator area (south facing),
- 1 pc generator junction boxes,
- with type 1 + type 2 surge protection,
- 1 pc shutdown,
- 1 pc system monitoring with sensors for connection to a portal,
- 1 pc. 32 "multimedia display,
- 30 m laying systems,
- 300 m connection cable,
- Registration with the energy supplier.
Outdoor facilities and engineering structures
Outdoor facilities 130 m; Demolish fence 47 h .; Clearing rootstock 40 m; Abort rain gutter 1,620 m 2nd ; Demolition of concrete slabs 120 x 120 cm 7 m 2nd ; Demolition of pavement slabs 30 x 30 cm 16 m 2nd ; Demolition of road building boards 60 x 300 x 15 cm 29 m 2nd ; Pick up concrete stone paving 20 x 10 x 8 cm and reinstall it 48 m 2nd ; Demolition of concrete stone pavement 20 x 10 x 8 cm 16 m 2nd ; Demolition of concrete ceiling (gusset and strips) 51 m; Demolition of concrete slabs 120 x 120 cm 118 m; Demolition of concrete shelves 775 m 2nd ; Remove turf 1,650 m 3rd ; Loosen and dispose of floor 60 m 3rd ; Loosen the floor and store it to the side for 20 m 3rd ; Dispose of excess stored soil 3 800 m 2nd ; Create rough planum 2 160 m 2nd ; Compact the subsurface and make the formation 8 m 3rd ; Create frost protection layer d = 22 cm 407 m 3rd ; Create frost protection layer d = 28 cm 217 m 3rd ; Create a gravel base course d = 15 cm 92 m 3rd ; Create gravel base course d = 18 cm 10 m 3rd ; Install fall protection gravel 1 991 m 2nd ; Create paved area 242 m; Lawn board set 56 m; Put highboard 91 m; Set lowboard 88 m; Make runner row 51 m; Install palisades H = 40 cm 108 m; Install palisades H = 60 cm 25 m; Install palisades H = 80 cm 38 m; Make brickwork 6 m; Install concrete block steps 2 pcs .; Manufacture steel staircase including plant planning / statics 28 m; Manufacture railings including plant planning / statics 42 m; Make two-line paving slab 65 m; 3-line paving slab 11 pieces; Install street gullies 4 hours; Install bridge drains 16 m; Install facade channel 2 m; Install drainage gutter 104 pcs .; Install bicycle parking 1 pc .; Assemble the bicycle roof 42 m; Install seat pads 3 pcs .; Install dumpster 2 pcs .; Install table tennis table 2 pcs .; Install benches 1 pc .; Install the "Berg" play equipment 2 pcs .; Install bollards 5 pcs .; Install waste bin 2 pcs .; Install flagpole 1 pc .; Install mailbox 186 m; Install fence H = 120 cm 5 pieces; Install single / double leaf gate 51 m; Install rebate railings 342 m 3rd ; Deliver and apply topsoil 430 m 2nd ; Terrain profiling 915 m 2nd ; Planting area 668 m 2nd ; Lawn area 14 pcs .; Plant high stem 2 498 st .; Planting trees 683 pcs .; Perennials plant engineering structures rainwater 78 m; RW duct DN 300 PP 25 m; RW connecting cable DN 250 PP 115 m; RW connection line DN 150 PP 20 m; RW connection line DN 100 PP 3 pieces; RW shaft DN 1000 B 1 pc inspection shaft DN 400 PP.