Danube expansion Straubing-Vilshofen, section 1: Straubing-Deggendorf, flood protection polder Sand Entau, lot 1 - VE 453 - E-Technik SW Entau, lot 2 - VE 404 - E-Technik Siele BA1 + 2
VE 453 - E-Technology SW EntauLot 1: Electrical engineering VE453: Entau pumping station
Complete detailed technical planning, manufacture, delivery, assembly, connection and documentation on the basis of documentation provided by the Client for essentially by:
- 2 pcs dry transformers 20 / 0.4 kV; 280 kVA each
- 1 pc switchgear medium voltage UB = 20 kV
- 2 pcs of switchgear low voltage UB = 400 V
- Notstromeinspeisung UB = 400 V
- Control cabinets for flood protection pumps, gauge and El. Pusher
- Datenschrank
El. Connection of at least:
- 2 St. Dahlander-Engine
- 2 gate valves with electric drive
- Control console for sliding expectancy
- Indoor/outdoor lighting, sockets
- cabling
- accessories
Additional:
- risk assessment, CE declaration of conformity
- Commissioning/commissioning/operator instruction
Lot2 - VE 404 - E-Technik Siele BA1+2Lot 2: Electrical engineering VE404: Siele BA 1: Ainbrach, Dürrlohgraben, Entauer Graben; Siel BA 2: Seefeldgraben
Complete detailed technical planning, manufacture, delivery, assembly, connection and documentation on the basis of documentation provided by the Client for essentially by:
- 1x open-air cabinet for each above mentioned sluice
- 400 V feed-in, rail system and meter slot setup
- Notstromeinspeisung UB = 400 V
- Controls, displays
- 2 gate valves with electric drive for each above-mentioned sluice
- Control console for sliding expectancy
- Cabling of the sliders
- potential equalization
- accessories
Additional:
- Commissioning/commissioning/operator instruction