The construction project includes the reconstruction of Mankkaanlaaksontie between Ring Road II-Koivu-Mankkaantie.
The project also includes the renovation of Seiliniitty Street and the construction of a new flood barrier in the Seiliniitty area.
In addition, the contract concerns the cleaning of Gräsana, the construction of the Gräsanas bridge and the construction of related structures and landscaping. Mankkaanlaaksontie, Seiliniitty and Gräsanas are located in the Olari, Niittykumpu and Mankkaa districts.
The work area also includes the work on the streets intersecting and connecting to these streets to the extent required for the connection of the structures.
Uraka earthworks and earthmoving cars use renewable, fossil-free fuels.
Attention is also paid to the emission values of natural testicles materials used in the works.
In addition, recycled materials are used in the contract, e.g. The benefit of the KSAB material (bitumen-stabilised light gravel) excavated from the structure of Mankkaanlaaksontie will be used in the flood barrier of Seiliniity.
The project uses the Infrakit project bank, building information models and machine control.
The approximate location of the contract site is indicated in the guide map extract appended to the contract programme.
The construction project includes the reconstruction of Mankkaanlaaksontie between Ring Road II-Koivu-Mankkaantie.
The project also includes the renovation of Seiliniitty Street and the construction of a new flood barrier in the Seiliniitty area.
In addition, the contract concerns the cleaning of Gräsana, the construction of the Gräsanas bridge and the construction of related structures and landscaping. Mankkaanlaaksontie, Seiliniitty and Gräsanan are located in the Olari, Niittykumpu and Mankkaa districts.
The work area also includes the work on the streets intersecting and connecting to these streets to the extent required for the connection of the structures.
Uraka earthworks and earthmoving cars use renewable, fossil-free fuels.
Attention is also paid to the emission values of natural testicles materials used in the works.
In addition, recycled materials are used in the contract, e.g. The benefit of the KSAB material (bitumen-stabilised light gravel) excavated from the structure of Mankkaanlaaksontie will be used in the flood barrier of Seiliniity.
The project uses the Infrakit project bank, building information models and machine control.
The approximate location of the contract site is indicated in the guide map extract appended to the contract programme.