New construction of the 4th purification stage - Vogelholz sewage treatment plant
General contractor service - construction work
Reinforced concrete for floor slabs approx. 200 m³
Reinforced concrete for slabs approx. 300 m³
Reinforced concrete for columns approx. 120 m³
Reinforced concrete for walls approx. 708 m³
Filling and sectional concrete approx. 300 m³
Formwork for slabs approx. 1000 m²
Formwork for walls approx. 4160 m²
Formwork for columns approx. 540 m²
Bewehrungsstahl ca. 240 t
Fertigteiltreppen ca. 5 St.
Pumping station prefabricated part complete 1 flat rate
Working and protective scaffolding approx. 2200 m²
Heizungsleitungen PEHD da25 ca. 1300 m
(installation in floor slab and walls)
In-situ concrete bored piles, diameter 0.75m, approx. 1,700m
Reinforcement of in-situ concrete bored piles approx. 75t
Temporary anchor, length 10-15m approx. 1.900lfm
Micropiles, diameter 50mm,
Length 9.40m approx. 51 pcs.
Brunnengründung, DN 1000/1200
Height approx. 4.5m approx. 11 pcs.
Excavation pit, with disposal approx. approx. 6000m³
Dewatering, pumps approx. 4 pcs.
Conduit cable routes, DN 100, in the package approx. 450 running metres
Cable ducts approx. 11 pcs.
Asphalt work, roads and paths approx. 900m²
Ausbaugewerke
Flachdachabdichtung ca. 365 m²
Screed on insulation layer approx. 325 m²
Floor coating approx. 200 m²
Flooring linoleum approx. 190 m²
Floor covering: tiles approx. 145 m²
Staircase tiles approx. 60 m²
Wall tiles approx. 200 m²
Painting approx. 450 m²
External thermal insulation composite system approx. 200 m²
Fassadenbekl./ Faserzementplatten ca. 320 m²
Trockenbauwände ca. 360 m²
Suspended ceilings approx. 320 m²
Windows and doors
Post-and-beam façade approx. 50m²
Post-and-beam façade with 2 door leaves
2100x3000 mm 1 St.
Posts approx. 16 pcs
Fighters approx. 20 pcs.
Windows 1100x1600 with external venetian blinds 3 pcs.
Windows 2100x1600 with external venetian blinds 3 pcs.
Windows 2100x900 with external venetian blinds 9 pcs.
Schaltraumtür 1260/3000 1 St.
Exterior door alu 1900x3000 1.St.
Interior door wooden door leaf, 1000/2600/150 10 pcs.
Interior door wooden door leaf, 875/2600/150 7 pcs.
Stahlblechtür T30 1000/2250/150 2 St.
Stahlblechtür T30 1000/3000/150 2 St.
Steel construction and locksmith work
Stair tower, steel weight approx. 4.5t plus railing and grating approx. 1 pc.
Escape balcony 20x1.8m, steel weight approx. 2t plus railing and grating approx. 1pc.
Stair railing for building interior staircase approx. 20m
Substructure supply air unit approx. 950kg approx. 1 pc.
Heating technology
Heat pump 30kW approx. 1 pc.
Heating manifold with 6 circuits and heating pumps approx. 1 pc.
Underfloor heating approx. 2750m
ventilation equipment
Zuluftgerät 2000m³/h ca. 1 St.
Supply air unit with heat recovery and cooling 5000m³/h approx. 1 pc.
Lüftungskanal ca. 820m²
Thermal insulation approx. 400m²
Regelklappen ca. 34 St.
Ceiling air inlets and outlets approx. 30 pcs.
Supply and exhaust air valves approx. 32 pcs.
sanitary equipment
Tiefspülkloset 3 St.
Urinal 2 St.
Showers 8 pcs.
Instantaneous water heater 17 pcs.
Drinking water pipe DN12-DN25 350m
Sewer pipe DN50-DN100 350m