Single lot - CIG A03F56151A Amount set as the basis for the tender € 17,546,865.92 net of VAT and options, of which € 425,645.81 for executive design expenses (€ 377,809.69 VA prog. compensation not subject to reduction and € 47,836.12 VA prog. general expenses subject to reduction) and € 1,229,825.98 for costs relating to the implementation of safety plans not subject to reduction.
Open tender, entirely managed in telematic mode, relating to the executive design and execution of the works for the construction of the new Taranto Nasisi station along the Taranto-Brindisi railway line including the construction of the passenger building, technological building, platforms and shelters, passenger underpass, rail-road interchange area, modifications and integrations of the current safety and signalling equipment, integration with telecommunications equipment for the passenger information service, construction of three tracks, adaptation of the electric traction system and related secondary interventions.
The validation of the project on the basis of the tender took place with note prot. RFI-VDO.DIN.DPT.PS\A0011\P\2023\0000179 of 14/11/2023.
The contract consists of a single lot, as the works in question are to be carried out only in the Taranto Nasisi station within which the only construction site is planned, it mainly consists in the construction of a single command and control apparatus of railway traffic with a high technological content closely interconnected and interdependent with the execution of the works to be carried out in the railway yard and the ancillary works functional to them strongly constrained by the time of execution and preparation of the various components of the main work.
Labour costs were estimated at € 3,461,779.03.
For further information on the amount, please refer to the Tender Regulations.
The collective agreement applied is Construction.
In this tender procedure we will proceed pursuant to art. 107 co. 3 of Legislative Decree. 36/2023.
The amounts of the work involved in the intervention, including security charges, and excluding tax charges are as follows:
Categories referred to in Annex II.12 of Legislative Decree 36/2023:
- OG03 for an amount of € 5,091,768.94 (of which € 125,145.37 for OS24; € 31,440.00 for OS09; € 127,652.10 for OG2 for the requirements referred to in the Final Determination of the Services Conference no. RFI-VDO. DIN. DPT\A0011\P\2023\0000053 of 10/11/2023 (hereinafter CdS);
- SQ011 – LOC-001 separable for an amount of € 3,871,401.83 (of which € 192,861.52 for the requirements referred to in the Final Determination of the CdS);
- SQ004 – LAR-003 separable for an amount of € 2,223,301.24;
- SQ005 – LIS-C separable for an amount of € 1,514,045.48;
- OS18-B separable for an amount of € 707,645.53;
- SQ001 – LTE-004 separable for an amount of € 684,386.16;
- OG01 separable for an amount of € 609,458.43;
- OS18-A separable for an amount of € 553,421.89;
- OG11 separable for an amount of € 469,109.61;
- SQ001 – LTE-002 separable for an amount of € 447,763.01;
- OG10 separable for an amount of € 380,445.18;
- OS21 separable for an amount of € 329,260.56;
- OS19 separable for an amount of € 265,951.51;
- OS04 separable for an amount of € 201,939.81.
Explosive ordnance clearance € 91,834.55 category B.TER classification II. The services may be subcontracted only to companies in possession of the requirements established by Ministerial Decree no. 82 of 11 May 2015 ascertained by the competent Office of the Ministry of Defence.
The total amount relating to the transport, disposal or recovery of waste is € 2,694,983.55; if the contractor does not meet the requirements set out in the relevant legislation in force, the services must be subcontracted to qualified companies in accordance with paragraph XV.1 of the Tender Regulations and in the Contract Template attached thereto.
Design Services: The fees were calculated based on the following categories/IDs. Classes referred to in the Ministerial Decree of 17.6.2016:
ID Category. Works/Classes:
- Mobility infrastructure V.03
- Building E.02
- Structures S.03
- IA.04 systems
- Structures S.04
- Structures S.05
- Systems IB.08
- Information and communication technologies T.02
- IA.01 systems
- IA.02 systems
- IA.03 systems
- Landscape, Environment, Naturalization, Agribusiness, Zootechnics, Rurality, Forests P.03
- Construction E.22
The procedure adopted for calculating the compensation for the design and the requirements for participation required to the designers are reported in the Competition Regulation.