1 Construction phase January 2024 to July 2024
approx. 1 piece Distributions
approx. 175 pieces of installation equipment
approx. 70 m cable tray up to 200 mm
approx. 90 pieces of lighting fixtures including outdoor lighting
approx. 460 m installation duct and pipes
approx. 3,400 m Installation cables 3x1.5 mm² - 5x10 mm²
approx. 25 m cable 4x35/16 mm²
ca. 2,500 m low-voltage cabling including EDP cabling
approx. 35 fire and sound barriers
Connection of power supply to converter measurement building, KNX system for sun protection control, intercom, nurse call system Beh-WC, construction site power with construction lighting
1 Construction phase January 2024 to July 2024
approx. 1 piece Distributions
approx. 175 pieces of installation equipment
approx. 70 m cable tray up to 200 mm
approx. 90 pieces of lighting fixtures including outdoor lighting
approx. 460 m installation duct and pipes
approx. 3,400 m Installation cables 3x1.5 mm² - 5x10 mm²
approx. 25 m cable 4x35/16 mm²
ca. 2,500 m low-voltage cabling including EDP cabling
approx. 35 fire and sound barriers
Connection of power supply to converter measurement building, KNX system for sun protection control, intercom, nurse call system Beh-WC, construction site power with construction lighting