Renovation of radiology and radiotherapy, S3 component B,C,D/ Lot 142 Heating system
In the Braunschweig Municipal Hospital, large-scale medical equipment is being replaced in various measures during ongoing operation.
Part of the overall construction project is the construction phase extension of the heating system (3rd to 6th construction phase). The construction measures include the dismantling and renewal of existing radiators, as well as the expansion of the network and the installation of new radiators. In addition, a temporary heating system is required as a rental system during the construction period.
Scope of services - KG 420 heating system:
- 30 St. Röhrenradiatoren
- approx. 500 m welded steel pipes up to DN20
- Heizkörperdemontage
- Skirting boards 25 m