Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 April 2021
Closing Date:
21 May 2021
Location(s):
DE128 Rhein-Neckar-Kreis (DE Germany/DEUTSCHLAND)
Description:
Framework contract for planning, assembly and delivery services

The following services are to be provided by the contractor:

- FO splice planning (backbone and FTTB) based on the implementation planning of the infrastructure, interconnection of the MFGs and RVts, as well as connection of the new house connections,

- Documentation of all components (from the POP to the end customer's APL) of the built FTTX routes,

- Setting up of tube distributors approx. 200 pieces,

- Procurement and delivery of the components

—— MFG18 incl. Base and ground spike,

- assembly material,

- If required LSA + strips,

—— ODF distributor,

—— FO splice and patch assemblies,

—— external meter column;

- Pre-assembly of the MFG18, approx. 80 pieces,

- Setting up the MFG18 including passive technology, approx. 80 pieces.

The project area encompasses 53 cities and municipalities in the Rhein-Neckar district.

Approx. 200 fiber optic tube distributors based on a fiber optic distributor UNI 6 housing with a standard configuration of 4 x 12 microtubes are used.

The MFG locations are secured and specified by the high-speed network Rhein-Neckar (ZV).

The MFG-18 are planned as pure fiber optic locations (max. 550 buildings per MFG with fiber optic connection). If required, the MFG-18s are to be provided as hybrid locations (max. 350 buildings per MFG with fiber optic cables.

Connection and up to 2x 100DA CU cables to KvZ).