The subject of the contract is the collection and management (in the R3 process) of waste code 20 02 01 in the maximum amount of 3000 Mg, but not less than 1000 Mg.
1. The subject of the contract is the collection and management (in the R3 process) of waste code 20 02 01 in the maximum amount of 3000 Mg, but not less than 1000 Mg.
2. Waste will be handed over in uncompacted form (in bulk).
3. Waste collection will be confirmed by waste transfer cards.
4. Waste will be transported and managed by the Contractor at the Contractor's expense. The amount of waste will be settled on the basis of a legalized cargo scale located at the Contracting Authority's premises of the Waste Management Plant in Wardyń Górny. Loading and related costs are charged to the Ordering Party.
5. At the time of handing over the waste by the Contracting Authority to the Contractor, the Contractor assumes responsibility for the waste taken over, for the proper handling of it and for the consequences resulting therefrom.
6. Waste will be loaded with the Contracting Authority's equipment, and the Contractor will be obliged to provide a container or other equipment adapted to collect this type of waste. The means of transport must meet the requirements of the applicable law, and in particular be technically efficient. The distances between the extreme axles of a vehicle entering the ZGO area may not exceed a length of 18 m, and its permissible total weight is to be in accordance with the provisions of the Regulation of the Minister of Infrastructure of 31 December 2002 on the technical conditions of vehicles and the scope of their necessary equipment (Journal of Laws of 2015, item 305).
7. At the time of announcing the procedure, the Contracting Authority does not have a permit for transboundary shipment of waste.
8. The Contractor shall be obliged to:
collection of waste from the Waste Management Plant in Wardyń Górny,
familiarize yourself, before proceeding with the subject of the order, with the health and safety regulations applicable to the facility,
collection of waste from the premises of the Plant, transport organized by the Plant and at its own expense during the Plant's working hours, i.e. from Monday to Friday, excluding public holidays and Saturdays from 7:00 a.m. to 3:00 p.m. or on other days and hours with the consent of the Ordering Party,
collection of waste on an ongoing basis, continuously, within 3 working days from the prior notification of the need for collection by the Ordering Party, as well as after agreeing the time of collection with the Ordering Party's representative,
a single collection from the Ordering Party will include a minimum of 20 Mg of waste.