Description:
London Gateway is developing a container storage yard at Berth 6 of the Port, involving extensive civil and electrical works including earthworks, drainage systems, and the installation of a substation.
Contract C2547 - Construction of Berth 6 East Container Storage Yard.
London Gateway (LGW) is planning to develop a container storage yard at London Gateway Port. The yard is located at Berth 6 of the Port, to the east of existing Berth 6 North and South Storage Yard. The total area of the Site is circa 43,500m2, comprising circa 33,500m2 container storage yard and circa 10,000m2 access road.

The scope of works include but not limited to:
(a) Employer Designed Civil Works
(i) Earthworks
(ii) Heavy duty pavements including high energy impact compaction and preparation of subgrade to receive pavement structure and associated edge restraints
(iii) Surface water drainage and associated piping works, channels and pits
(iv) Waste water drainage and associated piping works, pits and cesspool
(v) HV, LV and communication conduits and associated pits
(vi) Potable and fire water mains and associated pits, hydrants, meters and valves
(vii) Line marking
(viii) Lighting high mast foundations and lighting high masts installation
(ix) Retaining walls
(x) Fencing, gates, barriers, signage, CCVT/wifi posts and associated foundations
(xi) A prefabricated modular building
(xii) All tie-ins between the Works and adjacent areas/existing services
(b) Contractor Designed Electrical Works
(i) Substation including all switchgear and transformers and integration of new substation into existing 11kV distribution network
(ii) Substation superstructure and foundation
(iii) Extension to the existing SCADA system
(iv) Earthing systems
(v) High mast floodlighting installations
(vi) Installation of electrical control and protection systems including CCTV
(vii) LV electrical distribution and installation works
(viii) HV, LV and communication cabling works
The tentative commencement of site works will be the 1st quarter 2025. The time for completion of the works is 4 months.
The form of contract for this project will be ICE Conditions of Contract 2nd Edition September 2001 version
Download full details as .pdf
The Buyer:
LONDON GATEWAY PORT LIMITED
Additional information:
Link:
View Notice Source
Link:
Download Full Notice as PDF
CPV Code(s):
45000000 - Construction work