The Odyssud development consists of:
— expansion of existing station wharf which would become central,
— establishment of track communications east of the existing station at the railway platform level,
— creation of a connecting bar between Allée des Mûriers and Avenue des Tilleuls,
— resumption of the parking of the Marronniers with access from Avenue des Tilleuls from a ramp,
— Turn-to-left removal of the Allée des Mûriers towards Avenue des Tilleuls, present in the existing east of the station,
— removal of the turn left avenue des Tilleuls towards Allée des Mûriers,
— redevelopment of Avenue des Tilleuls (south and east of the parking lot),
— redevelopment public pedestrian space north shopping center,
— local construction of Tisséo operation south of the tram station with a space dedicated to the Sig-Fer,
— development of gentle pedestrian/cycle paths on Avenue des Tilleuls and tram platform crossings.
HRV Infrastructure and RailwayInfrastructure work and development of the partial terminal of the tram line and the surrounding roads.
Airline ContactServices of studies, supply and works for the realization of the overhead contact line.
Energy CFA/CFOProvision of studies, supplies and works for the realization of equipment and systems running low to strong currents.
Rail signallingRail signalling work.
Plantations and green areasPlantations and green spaces.
BuildingConstruction of a building of 76 m
— a Tisseo driver rest room,
— two PMR toilets,
— an office,
— a local computer bay,
— an independent space dedicated to railway signalling equipment.