The measure replacement new building 2-3. BA with building parts F1 and G is located in the southeastern area of the
Property of the Friedrich Ebert Hospital (FEK) in Neumünster. Access to the construction site is via the Sachsenring road. Building part F1 is surrounded by buildings almost on all sides. The building part F1 borders directly on existing building parts in which hospital operation continues. At the periphery of the
Construction site therefore needs to be acted with particular care. Building section G is designed as a complete new building on an existing open space and connected via F1.
- 10 patient cabinets,
- 8 control centers, nurse bases /monitoring
- 15 pantries,
- 12 workplaces work/impure work