It is intended to carry out a comprehensive building renovation at the workshop building of the vocational schools Kirchhain. With the comprehensive building renovation, a fire protection concept is implemented in addition to an energetic renovation of the thermal outer shell, the building services.
The building is a free-standing existing building (68.8m x 60.40m) single-storey construction with flat roof (inner core shed roof) on the school grounds in Kirchhain.
Construction phase no.1
94,00m² Removing/ disposing of paved areas
30,00pcs Widening/increasing door and window openings
16,00m² Remove/ Disposal/ New floor slab
92.00m³ excavated earth in the plinth area
292,00m² New KS masonry 24 cm
35,00pcs KS flat lintels double, different dimensions
166,00lfdm plinth waterproofing/ perimeter insulation/ dimpled membrane
46,00lfdm precast concrete - sleeper
3,00pcs reinforced concrete columns 24/ 24 cm, h = 3,70 m
30,00lfdm reinforced concrete ring anchor 24/ 24 cm
12,00m² Production of the new floor slab / insulation / lean concrete etc.
Construction phase no.2
175,00m² Removing/ disposal of paved areas
13,00pcs Widening/raising door and window openings
4,00m² remove/ disposal/ new floor slab
54.00m³ excavated earth in the plinth area
134,00m² New KS masonry 24 cm
11,00pcs KS flat lintels double, different dimensions
96,00lfdm plinth waterproofing/ perimeter insulation/ dimpled membrane
16,00lfdm precast concrete - sleeper
1,00pcs reinforced concrete columns 24/ 24 cm, h = 3,70 m
12,00lfdm reinforced concrete ring anchor 24/ 24 cm