Construction work | Tenderlake

Construction work

Contract Value:
DKK 18B - 18B
Notice Type:
Contract award notice
Published Date:
09 February 2022
Closing Date:
Location(s):
DK041 Vestjylland (DK Denmark/DANMARK)
Description:
Thor Offshore Wind Farm Tender - Contract Award Notice

The tender concerned a concession for the Thor Offshore Wind Farm, which will be located in the North Sea west of Thorsminde by Nissum Fjord at a distance of minimum 20 km from the shore and with a capacity of min. 800 MW and max. 1,000 MW. The contract has been concluded for an offshore wind farm with a capacity of 1,000 MW. Reference is also made to the contract notice no 2020/S187-448425 published 22 September 2020 and the prior information notice on this tender no. 2020/S 064-152011 published 31 March 2020. Further information on the tender can be found in the electronic tendering system used by the DEA: https://www.ethics.dk/ethics/eo#/bfb4d610-bfa1-4bfe-8808-6deb212e27cb/homepage

The tender concerned a concession for the Thor Offshore Wind Farm, which will be located in the North Sea west of Thorsminde by Nissum Fjord at a distance of minimum 20 km from the shore and with a capacity of min. 800 MW and max. 1,000 MW. The concession owner of Thor Offshore Wind Farm will receive subsidies in the form of a price premium for a 20-year period. The subsidies will be granted in accordance with a CfD-scheme designed for this tender.

The concessionaire shall carry out installation of the offshore wind farm, including possible offshore substation(s) and the grid connection from the offshore substation to the POC at the nearshore substation on land. The wind farm must be fully established and connected to grid 31 December 2027.

The financing of the installation of the offshore wind farm including Energinet’s part of the onshore facilities is to be paid by the concessionaire. The concessionaire will also be required to pay for pre-investigations etc. conducted by Energinet, and for any necessary mitigating actions in relation to Danish radar installations. License for electricity production and authorisation will be granted for 30 years with the possibility of a prolongation of 5 years if allowed under applicable regulation at the relevant time. The concessionaire must connect 95 % of the wind farm to the onshore POC by 31 December 2027 at the latest. The concession contract includes a possibility to request the DEA for later inclusion of a PtX-solution.

Awarded to:
Agreement on obligation to establish Thor Offshore Wind Farm and connect it to the grid
Thor Wind Farm I/S, Rødby (DK)
Download full details as .pdf
The Buyer:
Energistyrelsen
CPV Code(s):
31121310 - Windmills
31121320 - Wind turbines
31121330 - Wind turbine generators
31121340 - Wind farm
31160000 - Parts of electric motors, generators and transformers
31170000 - Transformers
31213400 - Distribution system
31300000 - Insulated wire and cable
45000000 - Construction work