Sports hall construction work | Tenderlake

Sports hall construction work

Contract Value:
EUR 4M - 4M
Notice Type:
Contract Notice
Published Date:
05 June 2023
Closing Date:
21 June 2023
Location(s):
ITI21 Perugia (IT Italy/ITALIA)
Description:
Integrated contract for PNRR works Stadium

Tender procedure opened in telematic mode with procedural reversal, according to the criterion of the most economically advantageous tender, for the award, in integrated contract, of the final and executive design (including the geological report and the safety coordinator during the design phase) and the execution of the works relating to the urban regeneration intervention from Palazzo Collicola to the Stadium area in the historic center of Spoleto

Integrated contract for the assignment of the final and executive design (including the geological report and the safety coordinator during the design phase) and the execution of the works related to the urban regeneration intervention from Palazzo Collicola to the Stadium area in the historic center of Spoleto.

The contract is financed with the resources allocated by the European Union to the Next Generation EU initiative and, more specifically, with the funds referred to in Mission 5 "Inclusion and Cohesion", Component 2 "Social infrastructure, families, communities and the third sector", Investment 2.1 "Investments in urban regeneration projects, aimed at reducing situations of marginalization and social degradation" of the National Recovery and Resilience Plan (PNRR)

Download full details as .pdf
The Buyer:
Centrale di Committenza Valle Spoletana e Valnerina per conto del Comune di SPOLETO
CPV Code(s):
45212225 - Sports hall construction work
71240000 - Architectural, engineering and planning services