Industrial chimneys | Tenderlake

Industrial chimneys

Contract Value:
EUR 3M - 3M
Notice Type:
Contract Notice
Published Date:
19 October 2021
Closing Date:
02 November 2021
Location(s):
FRK AUVERGNE-RHÔNE-ALPES (FR FRANCE)
FRK14 Puy-de-Dôme (FR FRANCE)
FRK25 Loire (FR FRANCE)
FRK26 Rhône (FR FRANCE)
Description:
Framework agreement and contracts works design realization of works intended to evacuate combustion gases from energy production of heat networks DALKIA and its subsidiaries regions ARA/Burgundy

The purpose of this consultation is to award a framework agreement and works contracts for the design and realization of several works intended to remove combustion gases from energy production equipment for urban heat networks operated by DALKIA and its subsidiaries in the Auvergne-Rhône-Alpes and Burgundy regions.

Contract works design construction of works intended to evacuate the combustion gases from the energy production of the boiler room of the heat network of VAULX-EN-VELIN VILLEURBANNE ENERGIES

The purpose of this consultation is to award a work contract for the design and realization of works intended to remove the combustion gases from one gas boiler and three biomass boilers (including condensation) as part of the renovation of the boiler room of the district heat network operated by VAULX-EN-VELIN VILLEURBANNE ENERGIES in the city of Vaulx-en-Velin.The works may include፦ the supply, installation and connection of flues and chimneys of diameters 500 to 1500 and up to about 55 meters high, - the acoustic treatment of combustion gases of production equipment.The power of the gas process will be about 20 MW. The total capacity of the biomass process will be approximately 24 MW. The installations will be to be realized and commissioned in 2022.

Market works design realization of works intended to evacuate combustion gases from the energy production of the boiler room of the VENISSIEUX ENERGIES heat network

The purpose of this consultation is to award a work contract for the design and realization of works intended to remove combustion gases from a gas boiler and a biomass boiler in the context of the construction of the boiler room of the urban heat network operated by VENISSIEUX ENERGIES in the city of Venissieux. works may include፦ the supply, installation and connection of flues and chimneys of diameters 500 to 1000 and up to about 21 meters in height, - the acoustic treatment of the combustion gases of production equipment.The power of the gas process will be approximately 8 MW. will be realized and put into service in 2022.

Contract works design realization of works intended to evacuate the combustion gases from the energy production of the boiler room of the ECLYDE urban heat network

The purpose of this consultation is to award a work contract for the design and realization of works intended to remove combustion gases from two biomass boilers (including condensation) as part of the renovation of the boiler room of the urban heat network operated by ECLYDE in the city of Champagne-au-Mont-d'Or. works may include፦ the supply, installation and connection of flues and chimneys of diameters 500 to 1800 and up to about 55 meters in height, - the acoustic treatment of the combustion gases of production equipment.The total power of the biomass process will be about 24 MW PCI. service in 2022.

Market works design realization of works intended to evacuate the combustion gases from the energy production of the boiler room of the SCEVIA urban heat network

The purpose of this consultation is to award a contract for the design and realization of works intended to remove the combustion gases from two gas boilers and one biomass boiler in the context of the construction of the boiler room of the urban heat network operated by SCEVIA in the city of Saint-Chamond.The works may include፦ the supply, installation and connection of flues and chimneys of diameters 500 to 800 and up to about 22 meters in height, - the acoustic treatment of the combustion gases of production equipment.The total power of the gas process will be approximately 9 MW. will be realized and put into service in 2022.

Market works design realization of works intended to evacuate the combustion gases from the energy production of the boiler room of the urban heat network ENERG'ISS

The purpose of this consultation is to award a work contract for the design and realization of works intended to evacuate combustion gases from two gas boilers and a biomass boiler in the context of the construction of the boiler room of the urban heat network operated by ENERG'ISS in the city of Issoire.The works may include፦ the supply, installation and connection of flues and chimneys of diameters 500 to 800 and up to about 18 meters in height, - the acoustic treatment of the combustion gases of production equipment.The total power of the gas process will be approximately 8 MW. realize and put into service in 2022.

Framework agreement design realization of works intended to evacuate combustion gases from energy production of heat networks operated by DALKIA and subsidiaries in the ARA/Burgundy regions

The purpose of this consultation is to award a framework agreement laying down the procedures for selecting undertakings and the general conditions for the execution of Subsequent Contracts for the design and realization of works intended to remove combustion gases from power generation equipment for urban heat networks operated by DALKIA and its subsidiaries in the Auvergne-Rhône-Alpes and Burgundy regions.The works may include the acoustic treatment of combustion gases in production equipment.A first subsequent contract, awarded simultaneously to this framework agreement, will concern the design and realization of works intended to evacuate combustion gases from three gas boilers, with a total capacity of 17 MW, as part of the renovation of the boiler room of the urban heat network operated by CLUSES ENERGIE in the city of Cluses. It may include the supply, installation and connection of flues and chimneys with diameters 300 to 800 and up to about 20 meters in height, as well as the acoustic treatment of the combustion gases of production equipment. These installations will be to be realized and put into service in 2022. The framework agreement is concluded without minimum, for a maximum value of 1,500,000 euros and does not confer exclusivity on the holder on the needs of the contracting entity.

Download full details as .pdf
The Buyer:
DALKIA Centre Est
CPV Code(s):
45262610 - Industrial chimneys