Sanitary fixture installation work | Tenderlake

Sanitary fixture installation work

Contract Value:
EUR 11M - 11M
Notice Type:
Contract Notice
Published Date:
24 June 2020
Closing Date:
21 July 2020
Location(s):
DE212 München, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
3-4200 Heating and sanitary installation women's changing room

The construction task involves the renovation of a listed building in the city center of Munich. The renovation is divided into several construction phases. The following list of services refers to the heating and sanitary installation of the women's locker room.

Core quantities:

- 2 3-piece washbasins;

- 2 wash basins;

- 1 piece furniture washstand with electronically controlled wash basin fittings;

- 14 showers with electronic shower fittings;

- 3 shower heads (sauna);

- 1 piece of rain shower (sauna);

- 5 toilets, washdown toilets;

- 8 shower channels and

- 12 floor drains new floor heating with approx. 225 m 2nd Area and 2 FBH distributors.

The work is divided into several construction phases. The individual execution dates must be clarified with the construction management.

- Beginning September 28, 2020;

- Ends 8.4.2021.

—— Raw installation BA 1, wellness: 28.9. until Oct 16, 2020;

—— Raw installation BA 2, changing room: 14.12.2020 to 20.1.2021;

—— Final assembly BA 1, wellness: 11.11.-17.11.2020;

—— Final assembly BA 2, changing room: 15.3.2020-8.4.2021.

The construction task involves the renovation of a listed building in the city center of Munich. The renovation is divided into several construction phases. The following list of services refers to the heating and sanitary installation of the women's locker room.

Core quantities:

- 2 3-piece washbasins;

- 2 wash basins;

- 1 piece furniture washstand with electronically controlled wash basin fittings;

- 14 showers with electronic shower fittings;

- 3 shower gushes (sauna) 1 rain shower (sauna);

- 5 toilets, washdown toilets;

- 8 shower channels and

- 12 floor drains new floor heating with approx. 225 m 2nd Area and 2 FBH distributors.

The work is divided into several construction phases. The individual execution dates must be clarified with the construction management.

- Beginning September 28, 2020;

- Ends 8.4.2021.

—— Raw installation BA 1, wellness: 28.9. until Oct 16, 2020;

—— Raw installation BA 2, changing room: 14.12.2020 to 20.1.2021;

—— Final assembly BA 1, wellness: 11.11.-17.11.2020;

—— Final assembly BA 2, changing room: 15.3.2020-8.4.2021.

Download full details as .pdf
The Buyer:
MTV München v. 1879 e. V.
CPV Code(s):
45232460 - Sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45332000 - Plumbing and drain-laying work
45332400 - Sanitary fixture installation work