Trier-Ruwer; Renewal of the drinking water pipeline and relocation of gas supply facilities in the "Auf Feiser" and "Hermeskeiler Straße (Teilstück)" sections
Water / gas supply systems and cable conduit installation.
Water / gas supply systems and cable conduit installation
Water supply systems:
- approx. 1 200 m
- approx. 380 m
- approx. 990 m laying dukt. Cast iron pipes DN 100 mm,
- approx. 750 m
- approx. 225 m
- approx. 550 m HA pipes PE DN 32,
- approx. 1 200 m
- approx. 400 m
- fittings, pressure reducing valve.
Gas supply equipment:
- approx. 600 m
- approx. 200 m
- approx. 525 m laying PEHD pipes d110,
- approx. 175 m
- approx. 75 m
- approx. 190 m HA cables PE DN 32,
- approx. 650 m
- approx. 150 m
- approx. 510 m laying of cable conduits d160.