tiling and tile work. Construction site equipment, 90 m2 floor tiles, 110 m2 wall tiles, 65 m base tiles, 400 m tile cutting, 90 m2 composite waterproofing floor W2-I, 130 m2 composite waterproofing wall W1-I, 7 pcs crystal mirror (various dimensions)
Natural stone and cast stone work. 20 pcs replacement of defective cast stone slabs in stock, 110 m2 grinding cast stone pavement, 75 m2 grinding cast stone steps, 70 m stair nosing profile
In general. The building is in flood area. The drywall work is carried out partly in stock (approx. 2,000 m³) partly in the new building approx. (5,700 m³). The roof of the two-storey, semi-basement structure is designed as a board pile ceiling, while the non-basement, partly two-storey new building is partly designed as a hollow ceiling and partly as a flat ceiling. The outer walls are concreted and the inner walls made of HLZ brick-built. The foundation of the new building is largely carried out as a base plate in various thicknesses.
tiling and tile work. Construction site equipment, 90 m2 floor tiles, 110 m2 wall tiles, 65 m base tiles, 400 m tile cutting, 90 m2 composite waterproofing floor W2-I, 130 m2 composite waterproofing wall W1-I, 7 pcs crystal mirror (various dimensions)
Natural stone and cast stone work. 20 pcs replacement of defective cast stone slabs in stock, 110 m2 grinding cast stone pavement, 75 m2 grinding cast stone steps, 70 m stair nosing profile