Mechanical and electrical engineering services | Tenderlake

Mechanical and electrical engineering services

Contract Value:
EUR 3M - 3M
Notice Type:
Contract Notice
Published Date:
01 April 2020
Closing Date:
01 May 2020
Location(s):
IE IRELAND
Description:
Building Services (M&E) Engineering Services for Additional Accommodation at Seamount College, Kinvara

Building Services (M&E) engineering services for additional accommodation at Seamount College, Kinvara, Co. Galway. Seamount College is a voluntary co-educational secondary school under the patronage of the Diocese of Galway.

This project is phase 2 of a two-phase project. Phase 1 is currently at design stage and comprises: a home economics room, a staff room, four general classrooms and toilets.

This phase 2 project: please see attached project brief and schedule of additional accommodation.

In summary, the project will comprise:

— six x general classrooms 58 m2 each,

— one x technology room 149 m2,

— one x technology prep area 58.6 m2,

— one x home economics room 119 m2,

— one x arts and crafts room 119 m2,

— one x science lab 88.6 m2,

— one x science prep area 38.5 m2,

— student and staff toilets 27 m2,

— locker space 43.2 m2,

— giving a gross floor area (including circulation, staircase and partitions of 1 331.9 m2.

And also:

— removal of prefabs,

— connection between phase 1 and phase 2.

Building services (M&E) engineering services for additional accommodation at Seamount College, Kinvara, Co. Galway. Seamount College is a voluntary co-educational secondary school under the patronage of the Diocese of Galway.

This project is phase 2 of a two-phase project. Phase 1 is currently at design stage and comprises: a home economics room, a staff room, four general classrooms and toilets.

This phase 2 project: please see attached project brief and schedule of additional accommodation.

In summary, the project will comprise:

— six x general classrooms 58 m2 each,

— one x technology room 149 m2,

— one x technology prep area 58.6 m2,

— one x home economics room 119 m2,

— one x arts and crafts room 119 m2,

— one x science lab 88.6 m2,

— one x science prep area 38.5 m2,

— student and staff toilets 27 m2,

— locker space 43.2 m2,

— giving a gross floor area (including circulation, staircase and partitions of 1 331.9 m2.

And also:

— removal of prefabs,

— connection between phase 1 and phase 2.

Download full details as .pdf
The Buyer:
Seamount College
CPV Code(s):
71300000 - Engineering services
71314310 - Heating engineering services for buildings
71318000 - Advisory and consultative engineering services
71321000 - Engineering design services for mechanical and electrical installations for buildings
71334000 - Mechanical and electrical engineering services