Sanitary and heating technology over the duration of 2 construction phases
1. BA and 2. BA supply and assemble of:
approx. 325 m SML pipe and fittings DN 50 - DN 150
approx. 175 m HT pipe and fittings DN 40 - DN 110
1 pc. faecal lifting station with double pump and accessories
approx. 630 m stainless steel pipeline with fittings for drinking water installation DN 12-50
1 pc. dry fire extinguishing pipe, feed and tapping points
approx. 50 pcs. Hand-held fire extinguisher with protective cabinets
approx. 70 pcs. sanitary assembly elements and sanitary ceramics
approx. 4,000 m heating pipe and fittings made of carbon steel with press connection
approx. 315 steel tubular radiators with accessories