Kuopion Electricity Network Oy (KSV) will build a new 110 kV substation as a separate contract at Savilahdentie 1, 70600 Kuopio. The old existing air-insulated switch facility will be replaced by a new GIS type switch facility during 2022 - 2023. The new 110kV GIS switch hardware will be placed in a new separately built instrument building next to the existing 20/10 kV instrument building. The old open switch field is later dismantled in a separate chore.
The cable chore is a KVR chore for a total price. The chore will be executed as planned, built, deployed and documented in accordance with the Subscriber's project description and any detailed instructions provided by the Subscriber.
The acquisition is described in more detail in the Appendix Savilahti cabling.