The construction project is intended to establish an interconnection (water supply) da 500 PE100-RC between Kneiting (REWAG) and Nittendorf Zweckverband of the water supply group Laber-Naab) over a length of approx. 8 135 m.
Lot 1 — Water pipe construction works (W-21-21a /construction km 0+000 to 3+150 (3,150 m)The construction project is intended to establish an interconnection (water supply) da 500 PE100-RC between Kneiting (REWAG) and Nittendorf Zweckverband of the water supply group Laber-Naab) over a length of approx. 8 135 m.
Lot 2 — Water pipe construction work (W-21-21b/construction km 3+150 to 3+925 (775 m)The construction project is intended to establish an interconnection (water supply) da 500 PE100-RC between Kneiting (REWAG) and Nittendorf Zweckverband of the water supply group Laber-Naab) over a length of approx. 8 135 m.
Lot 3 — Water pipe construction work (W-21-21c/construction km 3+925 to 6+000 (2,075 m)The construction project is intended to establish an interconnection (water supply) da 500 PE100-RC between Kneiting (REWAG) and Nittendorf Zweckverband of the water supply group Laber-Naab) over a length of approx. 8 135 m.
Lot 4 — Water pipe construction work (W-21-21d/construction km 6+000 to 8+135 (2,135 m)The construction project is intended to establish an interconnection (water supply) da 500 PE100-RC between Kneiting (REWAG) and Nittendorf Zweckverband of the water supply group Laber-Naab) over a length of approx. 8 135 m.